Shirlington Road NCS Project

In Design

Status

In Design

Location

A red arrow on Google street map shows the project limits from Glebe to 23rd Street S.

Shirlington Road from S. Glebe Road to 22nd Street S., in the Green Valley neighborhood.

About the Project

This stretch of Shirlington Road was nominated by a member of the public for consideration by the Neighborhood Complete Streets program and advanced to public engagement by the Neighborhood Complete Streets Commission due to:

  • Narrow and obstructed sidewalks on both sides of the street
  • Crash history
  • Vehicle volume and speed
  • Proximity to schools and parks and location in a Vision Zero Equity Emphasis Area

Project Goals

  • Provide an accessible and unobstructed sidewalk to provide a safe and comfortable pedestrian route.
  • Utilize the existing, County-owned right of way while balancing priorities to achieve a complete street for all who travel on Shirlington Road.

Project Background

Master Transportation Plan

Master Transportation Plan

  • Streets Element: The Complete Street policy informs the scope of this project to improve safety for all road users by providing a complete sidewalk where none exists right now.

Vision Zero

Vision Zero

  • Vision Zero policies call on County staff and the Arlington community to take a proactive approach to safety to eliminate severe and fatal crashes from our transportation network by 2030. This segment of 13th Street N. was awarded points consistent with the NCS Project Ranking Guidelines for the history of injury crashes and vehicle and bike volumes. Completing the street will provide a safer experience for those traveling on 13th Street N.

Neighborhood Complete Streets Program

Neighborhood Complete Streets

  • The Neighborhood Complete Streets (NCS) program was established by the Arlington County Board in January 2016 to address safety and access problems on local (non-arterial) streets through physical improvement projects.
  • The Neighborhood Complete Streets Commission was chartered to advise the County Board on the NCS program and make recommendations for projects to fund. This project has arisen following the guidelines of the program, with the oversight of the Neighborhood Complete Streets Commission.

About the Process

Winter 2025/6 – Project Selection

Level of Engagement: Involve

  • Nominated for NCS consideration, included on list of Nominated Streets since 2019
  • Ranked #6 project on list of nominated streets 2024
  • Selected for advancement into public engagement by the Neighborhood Complete Streets Commission at their February 23, 2026 meeting

Spring 2026 – Concept Design Engagement

Level of Engagement: Involve

  • Learn more about the project area and how that information informed the concept design
  • Review and share comments on concepts

Input gathered will help evaluate and refine development of a final concept.

Materials

Spring/Summer 2026 – Funding Hearing and Final Concept Design

Level of engagement: Involve