716 South Glebe Road - Sunrise South Glebe
Location
The 1.98 (86,364 sf) site is located at 716 S. Glebe Road in the Alcova Heights neighborhood. The site is currently occupied by a church building, vacant single-family house and surface parking. The site is bordered by Alcova House to the west, and one- and two-family residences to the north, east and south., Arlington, VA 22204 View Map
38.864772783185856, -77.09345906456329
The 1.98 (86,364 sf) site is located at 716 S. Glebe Road in the Alcova Heights neighborhood. The site is currently occupied by a church building, vacant single-family house and surface parking. The site is bordered by Alcova House to the west, and one- and two-family residences to the north, east and south. ,
Arlington, VA 22204
The 1.98 (86,364 sf) site is located at 716 S. Glebe Road in the Alcova Heights neighborhood. The site is currently occupied by a church building, vacant single-family house and surface parking. The site is bordered by Alcova House to the west, and one- and two-family residences to the north, east and south. ,
Arlington, VA 22204
StatusUnder Review
This reports the status related to the Site Plan Review Process only (Administrative Regulations 4.1).
About the Project

The applicant, Sunrise Senior Living, LLC, proposes the rezoning and demolition of an existing church building and vacant single-family house for the development of a new 4-story assisted living facility. The proposal consists of 108 units with approximately 93,306 square feet of residential gross floor area (1.08 FAR).
Additional project details include:
- Rezoning from “R-5” One-Family and Restricted Two-Family Dwelling District and “R-6” One-Family Dwelling District to “S-D” Special Development District
- The GLUP designation is Semi-Public and “Low” Residential (1-10 du/ac)
- 108 assisted living units (141 bedrooms)
- 54 parking spaces (0.38 spaces/bedroom)
Proposed modifications for:
- Reduced residential parking ratio (0.50 spaces/bedroom required)
Background Information
Public Process
Timeline |
Milestone / Meeting |
Materials |
February 6, 2023
|
Site Plan Acceptance |
|
February 22, 2023 |
Site Plan Review Process Kick-Off |
|
March 20-30, 2023 |
Online Engagement Opportunity
Review focus: Land Use & Density, Site Design & Layout, Building Height, Form and Architecture, Transportation and Open Space & Landscaping
|
Feedback:
|
April 24, 2023
View Meeting Recording
|
Site Plan Review Committee (SPRC) Meeting (Hybrid)
Agenda Topics: Land Use & Density; Site Design & Layout; Building Height, Form & Architecture; Open Space & Landscaping
|
|
TBD |
Site Plan Review Committee (SPRC) Meeting (Hybrid) |
|
TBD |
Planning Commission Meeting |
|
TBD |
County Board Meeting |
|
*Process timelines are subject to change as needs arise. Check back for updates.