1401 Wilson Boulevard

Under Review

Location

The 2.1 acre (91,614 sf) site is located at 1401 Wilson Boulevard and 1400 Key Boulevard in Rosslyn. The site is currently occupied by two 12-story office buildings constructed in 1964. The site is bordered by the Key & Nash condominiums and Turnberry Tower condominiums to the north, Hyatt Centric Arlington hotel and the unbuilt Ames Center Site Plan (SP #1) to the east, an office building to the south, and 1800 Oak apartments and an office building to the west., Arlington, VA 22209  View Map

Google Map

Status

Under Review

This reports the status related to the Site Plan Review Process only (Administrative Regulations 4.1).

About the Project

1401 Wilson Blvd.png

SPLA26-00001 (Major Site Plan Amendment)

Virtual Walking Tour

Project Description

The applicant, Monday Properties, proposes the construction of two 27-story residential towers, a shared partially below-grade parking structure, a planned grocery store, ground floor retail, and new public space contributing to the Rosslyn Sector Plan's 18th Street Corridor. The proposed density is approximately 10.0 FAR. This is a major site plan amendment to an approved site plan at the subject site, 1401 Wilson Blvd (SP #429).

Additional project details include:

  • The zoning designation is “C-O Rosslyn” Mixed Use Rosslyn District
  • The GLUP designation is “High” Office-Apartment-Hotel and is subject to GLUP Note 15: Rosslyn Coordinated Redevelopment District
  Wilson Tower
(South)
Key Tower
(North)
Total Site
Building Height  300 ft  300 ft  -
 Units  506 units 325 units 831 units
 Residential GFA  471,610 sf  415,622 sf  887,232 sf
 Planned Grocery Store GFA  -  17,004 sf  17,004 sf
 Ground Floor Retail GFA  11,904 sf  -  11,904 sf
 Residential Parking  -  -  528 spaces
(0.63 sp/unit)
 Residential Visitor Parking  -  -  16 spaces
 Retail Parking  -  -  55 spaces
 Loading Spaces  2 spaces  4 spaces  6 spaces
(3 residential, 3 retail)

Proposed modifications for:

  • Additional density
  • Density exclusions
  • Reduced residential ratio
  • Increased compact parking ratio (35%)
  • Reduced residential loading spaces

Applicant Materials

Public Process

Timeline Milestone / Meeting Materials
January 29, 2026 Site Plan Acceptance
March 19 - 29, 2026

Online Engagement Opportunity

Focused on the following topics:

  • Land Use and Density
  • Site Design and Layout
  • Building Height/Form/Architecture
  • Transportation
  • Parking and Loading
  • Open Space and Landscaping
  • Green Building and Sustainability

March 27, 2026

12:00 p.m. to 1:00 p.m.

In-person only

In-person Walking Tour

Meeting Location: Corner of Wilson Boulevard and North Oak Street

  • Coming Soon

April 27, 2026

Hybrid Site Plan Review Committee (SPRC) Meeting #1
Agenda Topics: TBD

  • Coming Soon

TBD

Hybrid Site Plan Review Committee (SPRC) Meeting #2
Agenda Topics: TBD

  • Coming Soon

TBD

Planning Commission Public Hearing

TBD

County Board Public Hearing

*Process timelines are subject to change as needs arise. Check back for updates.