Development Services Fee Analysis The goal of the Development Services Fee Analysis is to review our current fee structure and to provide recommendations for a new fee structure to capture costs more accurately.
N. Buchanan Street at 13th Street N. and 14th Street N. Improvements In the interest of providing needed safety enhancements on Arlington’s neighborhood streets, the Neighborhood Complete Streets Commission selected three pilot projects, including this intersection.
N Stafford St Improvements The Neighborhood Complete Streets (NCS) Program asked residents to tell the County where improvements are needed on our neighborhood streets. The process of collecting data to complete evaluation of all the applications received was delayed, and in the interim, three pilot projects were selected in 2018, with another three selected in 2019. N Stafford St was selected as one of three projects
South George Mason Drive Multimodal Transportation Study This Multimodal Transportation Study will review the South George Mason Dr. corridor from Route 50 to the Arlington/Fairfax line to identify improvements that deliver the vision, goals, and prior planning of Arlington County’s Master Transportation Plan (MTP). The study will develop corridor-wide concepts and a preliminary design concept for selected segments to use in future funding applications.
Dark Star Slip Lane Closure The Dark Star Slip Lane Closure will create the street cross-sections on Fairfax Drive, Fort Myer Drive and North Lynn Street called for in the Rosslyn Sector Plan.
15th Street S Pedestrian Improvements 15th Street South was identified for improvements in the Crystal City Sector Plan as a way to improve pedestrian access between the Crystal City Metrorail Station and destinations west of Richmond Highway.
West Glebe Road Bridge Reconstruction Project Start Date: August 31, 2023 This project replaced the deteriorated roadway substructure and added bike lanes to upgrade bike and pedestrian safety on the bridge. Artwork influenced by the surrounding environment was included to enhance the pedestrian experience.
S. Arlington Ridge Road and S. Lynn Street Safety Improvements Start Date: March 31, 2024 The two intersections covered by this project have experienced a high number of collisions. The goal of this project is to improve safety for all modes and create predictable vehicle movements at Lynn Street and the on/off ramps to I-395.
S. Arlington Ridge Road and S. Lang Street Safety Improvements On July 18, 2020, the County Board approved a contract with M&F Concrete Inc. to construct the improvements at South Lang Street. Work began in November 2020 and was completed in March 2021.
23rd Street South Realignment This project will be constructed in two phases. Phase 1 is between Route 1 and South Eads Street. Phase 2 is from Crystal Drive to Route 1, including the intersection at Route 1.