Gulf Branch Outfall Repairs

Status

In Design

Gulf Branch Outfall Repair - N Peary - Endwall 1

The outfalls at N Peary and N Nelson Street to Gulf Branch are actively eroding and undermining storm drain infrastructure.  

Project goals include:

  • Create a stable outfall
  • Maintain the storm infrastructure, repair erosion
  • Remove invasive plants, add native plants
  • Minimize impacts to the stream corridor

N Peary/Piedmont Street Outfall Repair 

The outfall behind N Peary St and N Piedmont St leads to a small tributary of Gulf Branch. The endwall of the stormwater pipe has fallen off into the stream channel and there is a large area with invasive bamboo and steep banks. Additional site-specific project considerations include maintaining the pedestrian bridge, feasible access paths, protecting high-value habitat, and coordinating the approach with neighbors.

Date Location and Description Meeting Materials

Fall 2025 - Winter 2026

Final Design Engagement  Presentation(PDF, 5MB)
Summer 2025 Concept Design Engagement Presentation(PDF, 6MB)
2023 - Early 2025

Initial contact with immediate neighbors



 

N Nelson Street Outfall Repair

This outfall at N Nelson Street leads to another small tributary of Gulf Branch. The endwall and concrete pad have been undermined and there is extensive erosion underneath. The flow of water has created a small hole in the concrete pad and is dripping through to the area below. There is also additional erosion upslope of the outfall.

Date Location and Description Meeting Materials
Spring 2026

Concept Design Engagement



2023 - 2025

Initial contact with immediate neighbors during information gathering