4100 Fairfax Drive

Location

4100 Fairfax Drive; The 0.91-acre site is located in the Ballston-Virginia Square neighborhood. It is bound by Fairfax Drive to the north, S. Randolph Street to the east, the Richmond Square apartments to the south, and the IHOP restaurant to the west. The property is zoned C-O-A Mixed Use; designated as "Coordinated Mixed-Use Development" on the General Land Use Plan; and is within the Ballston Sector Plan area., Arlington, VA 22203  View Map

Google Map

Status

Under Review

About the Project

An aerial view shows the project site, 4100 Fairfax Drive, and surrounding streets and buildings.

SP #269

The developer, Red Fox DC, LLC, and its applicant has applied for an adaptive reuse site plan amendment to SP #269. This is one of the first projects to implement the Adaptive Reuse Site Plan Amendment provision of the Arlington County Zoning Ordinance. The applicant proposes the following changes: 

  • Convert 254,474 square feet of existing office and retail equivalent use to approximately 269 residential units and residential amenity space. 
  • Convert approximately 6,896 square feet of building storage and maintenance areas on the P1 level to residential amenity space.  
  • Renovate the rooftop to provide a pool and indoor/outdoor gathering space for residents, which would result in an additional 4,298 square feet of gross floor area (GFA) on the roof. 
  • Increase the overall GFA of the building by a total of 11,194 square feet as permitted by § 15.5.9.D of the Zoning Ordinance. 
  • Retain the existing below grade garage and the existing 6,079 square-foot retail space along Fairfax Drive. 

Aside from the facade revisions for the rooftop amenity area, no other changes to the existing building exterior are necessary except for new windows. 

Related Plans

This site is located within the boundaries of the Ballston Sector Plan (adopted 1980). 

Policy on the Transformation of Commercial Office Buildings in Arlington 

 

Public Process

Timeline Milestone / Meeting Materials
March 2025 Application Acceptance

September 3, 2025

 

 

 

Planning Commission

Public Hearing

September 13, 2025

County Board

Public Hearing

*Process timelines are subject to change as needs arise. Check back for updates.