This page shares information and updates about multiple Arlington County projects and initiatives to improve safety and access on South Carlin Springs Road between Arlington Boulevard and Columbia Pike.

South Carlin Springs Road is slated to undergo a corridor study as part of the 10-year Capital Improvement Plan. The efforts on this page explore near-term opportunities to improve safety and access on South Carlin Spring Road.

Project Goals

  • This project utilizes multiple tools and strategies to improve pedestrian safety on South Carlin Springs Road.
  • Some safety improvements are dependent on acquisition of right-of-way from private property owners along South Carlin Springs Road.

Project Basis

Master Transportation Plan

  • Streets Element: The Complete Street policy informs the scope of this project to improve safety for all road users.
  • Primary Transit Network: This street is part of the primary transit network, served by Metrobus 25B and Arlington Transit Route 75.

Vision Zero

  • Vision Zero policies call on County staff and the Arlington community to take a proactive approach to safety in order to eliminate severe and fatal crashes from our transportation network by 2030.
    • South Carlin Springs is identified as a speed reduction corridor.

Existing Conditions

Roadway characteristics

  • Four vehicle lanes with some left turn bays
  • Primary Transit Network (Metrobus 25B and Arlington Transit Route 75)
  • 4-5’ wide sidewalks with 0-2’ buffer
  • Some curb ramps are not compliant with the Americans with Disabilities Act (ADA)
  • No bicycle facilities

Speed information

  • Posted speed limit of 30 mph (additional $200 fine zone)
  • 20 mph beacon school slow zone (Route 50 to 7th Place S.)
  • 85th percentile speed of 34 miles per hour

Constraints

  • Limited public right-of-way
  • Utility conflicts

Completed Projects

Safety Measures - 2018-2024

Level of Engagement: Communicate

  • 2024: Asphalt patch sidewalk widening around utility pole near South Carlin Springs Road and 5th Road South
  • 2021: Vision Zero South Carlin Springs Road Walkability Pilot
  • 2020: “Speeding: Additional $200 fine” signage added
  • 2018-2021: S. Carlin Springs Road Safety Measures: Arlington Boulevard to 7th Road South and 7th Road South to Columbia Pike
    • 2018: Installed additional signage, markings, and bollards at intersections
    • 2019: Concrete improvements (including curb extensions) at multiple intersection locations (1st St S, 2nd St S, 3rd St S, 4th St S, 5th St S, 8th Pl S, 8th Rd S, and 8th St S)
    • 2019: Sidewalk widened between 7th Road South and the Campbell Elementary School entrance
    • 2020/1: Additional pedestrian safety improvements, including medians, crossing infrastructure, and a two-stage crossing with a pedestrian-access controlled RRFB at 8th Road South.

School Slow Zone & Speed Camera Installation - Summer 2024

Level of Engagement: Communicate

  • New school slow zones were established starting in spring 2021 and augmented with additional signage and markings in 2022.
    • Dynamic slow zone: South Carlin Springs Road (Arlington Boulevard Service Road and 7th Road South) and 5th Road South (Arlington County Boundary and South Carlin Springs Road)
    • Static slow zone: 2nd Street South (South Madison Street and 1st Street South)
  • Speed cameras will be added at 1st Street South and south of 6th Road South, with installation in summer 2024.

Upcoming Projects

Signal Upgrades - Summer/Fall 2024

Level of Engagement: Communicate

  • Signal upgrades will be made at these locations:
    • 3rd Street S.: Completed fall 2024
    • 5th Street S.: In design
    • 6th Road S.: Completed summer 2024

Sidewalk Improvements - 2024-2027

Level of Engagement: Consult

The goal of this project is to improve pedestrian safety and access on S. Carlin Springs Road by expanding existing sidewalks and installing a buffer zone between pedestrians and vehicular traffic on Carlin Springs Road between 3rd Street S. and 6th Road S.

  • Arlington County is reviewing opportunities to improve the sidewalk conditions on S. Carlin Springs Road, including widening where possible.
    • Anticipated Phase 1: 5th St S to 5th Rd S (east side)
    • Anticipated Phase 2: 3rd St to 6th Rd (east and west side)
    S-Carlin_phase-map_legend.png  
  • Due to limited space within the public right of way, improvements are dependent on ongoing negotiations with nearby property owners.
  • Updates will be provided in fall 2024.

S-Carlin_streetmix.png This image is for illustrative purposes only and does not represent a concept design. Exact dimensions vary by block.


Future Efforts

S. Carlin Springs Road Corridor Study - Anticipated 2026-2027

Level of Engagement: Involve (anticipated)

  • South Carlin Springs Road is slated to undergo a corridor study as part of the 10-year Capital Improvement Plan.
  • Work on the study is anticipated to take place in 2026-2027

 


Community Outreach

Fall 2024 - S. Carlin Springs Road Open House

Community members joined project staff at Kenmore Middle School for an open house to learn more about the past, present, and future projects to improve safety and access on South Carlin Springs Road between Arlington Boulevard and Columbia Pike.

Meeting Materials