3900 North Dumbarton Street, Arlington, VA View Map
The existing culverts that carry Little Pimmit Run under North Dumbarton Street have reached the end of their useful life and are in need of replacement. The culverts are undersized for the location and sometimes Little Pimmit Run stream overflows the top of the culverts. The new culverts will be an open span arch design to better allow flow through the culvert. The culvert replacement project aims to provide a long-term solution for the residents of N Dumbarton Street, improving their quality of life and reducing the risk of flood damage to properties. Furthermore, the project will contribute to the overall health and sustainability of the Little Run watershed. Both the upstream and downstream culverts will be replaced.
The Federal Emergency Management Agency (FEMA) floodplains have also been analyzed to ensure the most effective flood mitigation strategies are implemented.
Downstream Culvert
Project Design - 2023-2025
Construction
Meeting Presentation
Meeting video
Related Links