Project limits: North Glebe Road from North Old Glebe Road to Little Falls Road., Arlington, VA 22207 View Map
Project limits: North Glebe Road from North Old Glebe Road to Little Falls Road. , Arlington, VA 22207
Construction began in June 2020 and was completed in late 2021.
This project rehabilitated an existing 36-inch transmission water main of prestressed concrete cylinder pipe (PCCP) that has been out of service since 2013, after a parallel main was installed. Rehabilitating this main provides redundancy and reliability to the water system.
Rehabilitation included removing and replacing approximately 720 feet of main and slip lining approximately 3,400 feet. Slip lining is a method of inserting a slightly smaller pipe into an existing pipe. Slip lining greatly reduces the amount of disturbance, since a trench does not need to be dug for the entire length. Excavation pits are required at various points to install the new pipe.
This project involved the replacement and rehabilitation of infrastructure along the same corridor. Water service disruptions were at a minimal to non-existent. Advance notice of any disruptions given to residents. All work done during the construction working hours stated above.
The North Glebe Road PCCP Water Main Rehabilitation Project is budgeted in the utilities portion of the FY 2019 – FY 2028 Capital Improvement Plan (CIP).
Project Manager Regan Carver 703-228-3602
Construction Manager Ric Schultz 703-228-4826
Media Contact Katie O'Brien 703-228-4952