Ballston Pond, Arlington, VA 22201 View Map
Ballston Pond , Arlington, VA 22201
The Ballston Wetland project team was honored to receive the Virginia Governor's Environmental Excellence Silver award in April, 2025. The project was also recognized with the Dave Pearson award from the Virginia Lakes and Watershed Association in 2025 and by the Civil + Structural Engineering Media in the Environmental/Sustainability category as part of their 2023 Yearbook of Engineering Achievement.
Projects To Watch: Ballston Wetland Park - YouTube
Project Information
The Ballston Pond was originally designed and constructed as a stormwater detention facility to collect and slow stormwater runoff from Interstate 66 when the highway was built. Over the years, the pond filled up with sediments deposited by stormwater runoff, which slows down when it reaches the pond. The Ballston Pond not longer functioned as originally designed, and its water quality benefits were limited due to water flowing straight through the pond instead of taking a more circuitous route. In addition to invasive plants, trash was a continual issue. Construction began on Dec.1, 2021 and completed in August 2023.
Retrofitting the Ballston Wetland Park was a high-priority project in the County’s Stormwater Management Program. This pond receives runoff from more than 450 acres of urban and suburban land, and represents the most feasible opportunity within Arlington for a larger regional stormwater management facility. Retrofitting the pond to provide more water quality treatment helps the County comply with the municipal separate storm sewer system permit and contributes to restoring the Chesapeake Bay.
The restored Ballston Wetland Park includes:
Maintenance Schedule
The restored Ballston wetland includes trash collection devices. These trash collection devices will initially be maintained on a quarterly basis (September, December, March, June) to remove accumulated material. In addition, trash will be removed from the pools and shorelines of the wetland twice per year.
Public Process
Meeting information
Planting Plan(PDF, 8MB)
Bluemont Room (2nd Floor)
The 100 percent concept design plan overview.
Aerial view of the pond under construction
Ballston Wetland project May 2023
Ballston Wetland October 2023
Ribbon cutting event
Communication ManagerAileen Winquist 703-228-3610
Project Manager Christin Jolicoeur 703-228-3588