Green Pavement Markings
Purpose
Green-colored pavement markings increase the visibility of a bike facility, identify potential areas of bike-vehicle conflict, and reinforce a bicyclist’s path of travel.
Description
Green pavement markings are typically used as a spot treatment in specific locations such as a bike box, intersection crossing, or conflict area. The color green is used because it is not easily confused with other standard traffic control roadway markings.
Safety Benefits
- Increase the visibility of cyclists.
- Alerts bicyclists of potential conflict areas.
- Increase driver yield behaviors.
- Provides guidance to bicyclists of the recommended path of travel.
Street Types and Context
Applicable Street Types
- Anywhere within bike lanes or cycle tracks where additional visibility is desired.
- Across turning conflict areas such as driveways or intersections.
- Across intersections, particularly large or complex ones where the bicyclist’s path may be unclear.
Other Location Guidance
- May not be applicable in locations where bicycles are expected to yield right of way.
- Should not be used where bicyclists are sharing the space with pedestrians, such as at multi-use trail crossings. Green should also not be used in conjunction with sharrows.
- When there are bus stops along a bike lane, red colored pavement markings may be used to distinguish between the transit lane and bike lane areas
Primary User Groups

Key Implementation Considerations
- Green pavement markings are more costly to maintain. Depending on the material used, requires varying levels of maintenance.
- Cannot be applied to areas where the pavement is deteriorating.
Expected Crash Reduction
Application of green pavement markings has led to a 10% decrease in crashes at signalized intersections with one colored marked bike crossing (Fehr & Peers, 2018).
Average annual total crashes also decreased by 12% for all applications of green pavement, but this also includes vehicle-only crashes (Fehr & Peers, 2018).
Cost

Typically, moderate cost but it varies based on treatment material used.
Timeline

Less than one year to three or more years, depending on complexity.
Application in Arlington
Visit Vision Zero Program Dashboard: Green Markings to see where these tools has been implemented.