Crystal City to Reagan National Airport Multimodal Connection (CC2DCA)

Learn More and Share Your Feedback

This project explores the possibility of providing a context-sensitive multimodal connection between Crystal City and Ronald Reagan Washington National Airport (DCA) for use by people walking, biking, and using micromobility devices. The study includes environmental reviews required by the federal NEPA review process.

The CC2DCA connection could provide residents, visitors, and business travelers of all ages and abilities with a safe and convenient way to reach the airport from Crystal City. Not only could the project provide pedestrian and bicycle access to a national air travel hub, it could also potentially create and enhance multimodal connections among the airport, the relocated Virginia Railway Express (VRE) commuter rail station, and the multi-use Mount Vernon Trail.

Location

The potential connection will link Crystal City to National Airport. The specific location of the connection is yet to be determined.

CC2DCA study area map

Map of study area(JPG, 1MB) (full size)

Status

Pre-National Environmental Policy Act (NEPA) efforts for the CC2DCA connection were formally kicked off in spring 2021. Initial activities include data collection (including field surveys, if and as needed) and agency coordination and public outreach.

To receive updates, sign up for the Crystal City-Pentagon City Transportation Update email on the right side of this page. 

What to expect during the environmental review process

CC2DCA would use federal funds and could impact federal lands. Therefore, it is subject to NEPA and the County must develop alternatives and conduct an environmental analysis before identifying a preferred design concept. We anticipate this process will take approximately three years to complete.

This work will be done in collaboration with the Virginia Department of Transportation (VDOT) and other regional, state and federal agency partners. The potential environmental impacts of the alternatives will be evaluated in a NEPA document. This document is now anticipated to be an Environmental Assessment (EA) which would be published in late summer or early fall 2023. The study also will advance the production of required documentation and approvals by appropriate federal agencies.

A preferred alternative, including a specific type of facility and alignment, will be identified in the EA, which will also list environmental commitments to avoid, minimize, or mitigate adverse impacts on the environment from the project. After the NEPA process is complete, all necessary federal permits and authorizations will be obtained.

Arlington County will further advance the design of the selected connection in preparation for the next phase of the project (final design and construction). This work will be completed under a different contract and is not part of the study. 

Public Process

Public involvement is pivotal to the NEPA process; opportunities to engage with the study will be provided throughout its development. Given the importance of this project, the County has developed a comprehensive public participation plan in accordance with NEPA requirements and consistent with the County’s Six Step Public Engagement Guide for Capital Projects.

OPEN NOW - Winter 2021 Engagement and Community Outreach

The project team has kicked off the 2nd public engagement checkpoint for the CC2DCA Study, covering the process from Purpose & Need to preliminary feasibility for project corridors and initial concept designs. For more details on how we got here, review the materials from the first phase of public engagement below.

This public engagement window will be open from November 29, 2021 to January 9, 2022.

You can provide your feedback in one of three ways:

Online Feedback Form

The online feedback form will guide you through a high-level overview of the study's progress to date, and ask for your feedback along the way. You'll be asked to review some of the engagement materials posted below at various points, and answer questions about them.

Progress Overview & Feedback Form

Resumen de progreso y formulario de comentarios

进展概述和反馈表

Virtual Question & Answer Session

The project team will host a virtual Question & Answer session on December 7, 2021 from 7:00pm to 8:00pm to answer questions about the study's progress so far. You'll get the most out of this meeting if you've reviewed the engagement materials posted below before the meeting.

Learn More and Join by Phone | Join the Zoom Meeting

Submit Comments by Email

You can submit your input about the study and its progress so far via email at any time by emailing your comments to info@cc2dca.us.

Submit comments by email

Key Engagement Resources

Pre-Recorded Presentation

The project team has prepared a pre-recorded presentation to update you on our progress and walk you through the process so far. You can watch the entire presentation (approximately 30min) or watch segments covering each part of the engagement.

Entire Video

CC2DCA Study Update: Complete Pre-recorded Presentation

Actualización del estudio CC2DCA: Presentación pregrabada completa 

CC2DCA研究的最新进展:预先录制的演示文稿

Segments

Corridor Factsheets

Learn more about each of the 14 corridors analyzed and screened for the study in this set of 1-page factsheets.

Corridor Factsheets | Hojas informativas de los corridores | 通道详情介绍

VIDEO: Screening the Potential Corridors (En Español用中文)

Concepts Factsheets

Learn more about each of the initial concepts for the multi-modal connection analyzed and screened for the study in this set of 1-page factsheets

Concepts Factsheets | Hojas informativas de los conceptos | 概念设计详情介绍

VIDEO:  Screening the Potential Concepts (En Español用中文)  

Fall 2021 Newsletter

CC2DCA Study - English(PDF, 467KB)Estudio CC2DCA - español(PDF, 698KB)CC2DCA研究-2021年秋季简报(PDF, 667KB)

July 2021 Community Meeting

A virtual community meeting was held on July 15, 2021, to present the study to the public and solicit initial comments on the potential CC2DCA connection.

Online questionnaire

An online form was available from July 15 to Aug. 15, 2021, for providing input to help define the project’s purpose and need.

To receive notification of upcoming public participation opportunities, sign up for the Crystal City Pentagon City Transportation Update email on the right side of this page. 

About the Project

In 2010, Arlington County adopted the Crystal City Multimodal Transportation Study. The study made transportation improvement recommendations for the Crystal City area including the construction of a pedestrian and bicycle connection to the airport.

The Crystal City Business Improvement District (now known as the National Landing BID) initiated a feasibility assessment in 2017 that looked at how to connect Crystal City and its myriad transportation options to the airport. The study evaluated various alignment and facility types to serve existing development and planned growth in Crystal City.

During development of its FY 2019-2028 Capital Improvement Plan, the County created a new project in the Crystal City, Pentagon City, Potomac Yard Streets Program to continue alternatives analysis and preliminary planning for a connection between Crystal City and DCA. The project had limited funding due to budget constraints.

In late 2018, with the announcement of an agreement to bring Amazon’s HQ2 to Crystal City, the Commonwealth of Virginia identified a CC2DCA connection as one of five transportation projects to be fully or partially funded by the Commonwealth.

VDOT added the project to its Six-Year Improvement Program in 2019. This included an allocation of $9.5 million in federal funding for project planning, NEPA documentation and preliminary engineering.

The Federal Highway Administration (FHWA) is the lead agency for the environmental review on this project, while VDOT is the joint lead agency for the purposes of preparing the NEPA document. Concurring, cooperating, and participating agencies will be identified and formally invited in these roles after the NEPA process kicks off. To date, the National Park Service, Federal Aviation Administration, Metropolitan Washington Airports Authority, US Army Corps of Engineers, and the US Environmental Protection Agency have agreed to participate in the study as potential concurring and cooperating agencies.

At its December 2019 meeting, the County Board approved an agreement with VDOT to allow the County to administer the project’s planning, environmental review and preliminary engineering phases.

On June 30, 2020, the County advertised a request for proposals to select a consultant to complete the project’s environmental documentation and conceptual design. The County Board approved a professional services contract at its March 20, 2021, meeting.