18th Street South Realignment

Location

18th Street South between South Clark-Bell Street and Crystal Drive, Arlington, VA 22202  View Map

Google Map

Status

Preliminary Proposal

This project is in the preliminary design phase.

18th Street South Realignment Rendering

The purpose of this project is to realign 18th St S in conjunction with the new park project that is occurring on the northside of the roadway. This project will provide new sidewalks and streetscaping, as well as upgrades to the bike network. This project is in both the Crystal City Sector Plan and the Crystal City Multimodal Transportation Study.

More details of the plans have yet to be worked out. 

About the Project

The purpose of this project is to complete the new alignment of 18th Street South and improve multimodal connectivity to the Crystal City Metrorail Station. The 18th Street South Realignment project is a goal of both the Crystal City Sector Plan and Crystal City Multimodal Transportation Study.

Featured improvements include:

  • New sidewalks
  • Street lighting
  • Traffic signal reconfiguration
  • Parking lane
  • Bike lanes in both directions
  • Two vehicle travel lanes in both directions

Funding

Local funds: TIP, TCF

 

The purpose of this project is to realign 18th St S in conjunction with the new park project that is occurring on the northside of the roadway. This project will provide new sidewalks and streetscaping, as well as upgrades to the bike network. This project is in both the Crystal City Sector Plan and the Crystal City Multimodal Transportation Study.