Donaldson Run Headwaters Outfall Repair

Location

2451 Wakefield Court,  22207  View Map

Google Map

Status

Complete

Donaldson-Run-outfall-repair-complete.jpg

Background 

This project repaired a failing storm sewer outfall between 24th Road North and the Analostan Homeowners Association Property which flows into Donaldson Run.  The project also stabilized the eroded stream channel below the outfall to a point that connects to a previously constructed stream restoration project.  A section of storm sewer pipe was also previously re-aligned as part of the project.  The stream stabilization included the installation of step pools to slow the energy of the stream flow and rock walls to protect the stream channel.   

Construction Schedule 

Construction is complete

Project plans

Part 1 - Includes existing conditions, tree inventory, erosion and sediment control plans, pollution prevention plans, plan and profile(PDF, 32MB)

Part 2 - Includes cross sections, stormwater computations, water quality impact assessment(PDF, 9MB)

Planting Plan

28 trees were removed for the project and 630 trees, 188 shrubs, and live stakes were planted.  View the landscape plan(PDF, 4MB)  and the plant list(PDF, 2MB) for the project.

Project Engagement

This project is a consult level engagement with the property owners adjacent to the project and communicate level engagement with the surrounding neighborhood.

Date Meeting Meeting Materials 
 Various dates  Meetings with property owners bordering the project   
 April, 2017      Meeting with Analostan HOA  
 March 18. 2023   Board Report    Construction contract was approved by County Board (Item #22) 
 March 28, 2023, 7 PM   Informational Meeting 

Meeting presentation(PDF, 10MB)

 Meeting video