22nd Street North Street improvement project on 22nd St N, from N Kentucky St to N Lexington St. The project scope includes; installation of curb and gutter, and associated storm water infrastructure, on the north side of 22nd St N, and installation of a curb extension with bioretention storm water management structure on the northeast corner of 22nd St N and N Kentucky St.
2nd Street South The street improvement and intersection project is proposed to reconfigure the intersection at 2nd Street S with S Uhle and S wise Streets to simplify traffic movements and eliminate the slip lane in front of 7-11.
2nd Street South and South Kensington Street A new 4′ wide concrete sidewalk will be constructed along the north side of the 2nd Street South and along the west side of South Kensington Street.
North Evergreen Street Intersection and Pedestrian Safety improvement project to include corner nub extensions at the following intersections: N. Evergreen St and Washington Blvd; N. George Mason Drive and 11th St N; N. Evergreen St and 11th St N; and N. Buchanan St and 11th St N.
N Ohio Street/John Marshall Trail Pedestrian safety and beautification improvements along N Ohio Street and the adjacent greenbelt/John Marshall Trail.
North Greenbrier Street The street improvement project is proposed to include; a new, continuous 6’ wide concrete sidewalk, curb and gutter on the west side of N. Greenbrier St from 27th St N to 26th St N and more
2134 N. Taylor St. – Artis Senior Living The applicant, Artis Senior Living of Arlington, LLC, proposes a rezoning and a new major site plan to demolish the existing vacant single-family homes and build a senior living facility.
Vacation Lane Pedestrian safety and street improvement project on Vacation Lane between N. Utah St to N. Stuart Street.