County Homepage
Capital Improvement Projects
Search Results
Back to Search
Trails & bikeways
Arlington Boulevard Trail Renovation
Implement trail improvements such as: repaving, and trail markings along the Arlington Blvd. trail.
Trails & bikeways
Army Navy Country Club Street Ext.
The goal of the project is study the feasibility of constructing a new street segment adjacent to Army Navy Country Club connecting the Arlington View neighborhood through to Army Navy Drive. The project will require a complete preliminary design and ...
Trails & bikeways
Bicycle Shelters
The proposed bike parking improvements will serve the needs of bycyclists accessing Metro stations. Two bicycle shelters including bicycle racks will be installed.
Trails & bikeways
Bike Lane Implementation
Implement Bike Lanes through out the County. Project provides for pavement markings and signs.
Trails & bikeways
General Trail Improvements
Implement trail improvements such as repaving, replace bridge decks, and other spot improvements through out the County
Trails & bikeways
George Washington PKWY Trail overpass
Study construction of a trail overpass and conection to the Mt. Vernon Trail near the 14th St. bridge.
Trails & bikeways
I-395 Shirlington Underpass, Four Mile Run Trail
Construction of a new trail section, from Shirlington Road to West Glebe Road, to connect the Four Mile Run and W&OD Trails via a passage below Shirley Highway (I-395). This will complete the 17 Mile Arlington Loop of trails. Project is to be ...
Trails & bikeways
Route 110 trail Memorial Dr. to the Pentagon
Construct a trail on the East side of Route 110 from Memorial Dr. to the Pentagon following the general alignment of the existing dirt path.
Trails & bikeways
S. Glebe Road at W. Glebe Rd Pedestrian Improvements
Pedestrian improvements to Intersection to include: Bike trail modifications and pedestrian crosswalks
Trails & bikeways
Washington Blvd. (Walter Reed Dr. to S. Rolfe St. - Phase II from proj. BK88, Phase I) (changed from BK94 to BK98 Grant funded on 5/4/09)
Construct bike trail along the west side of Washington Blvd from Arlington Blvd. to Towers Park. Slipt project BK88 to Phase I, and BK94 to Phase II on 7/05.
Trails & bikeways
Washington Blvd. trail (Arlington Blvd. (Rt. 50) to Walter Reed - Phase I
CONSTRUCT BIKE TRAIL ALONG THE WEST SIDE OF WASHINGTON BLVD. FROM ARLINGTON BLVD. TO TOWERS PARK