UTILITIES FUND
DEPARTMENT OF ENVIRONMENTAL SERVICES/DEPARTMENT OF PUBLIC WORKS
PROGRAM
MISSION: The agencies which comprise the Utilities Fund are charged with the
responsibility of providing and maintaining water delivery, sanitary sewer
removal, and wastewater treatment systems that provide high quality water and
sewer services and products.
FY 2004
PRIORITIES: The FY 2004
priorities of the Utilities Fund are:
-
To work
with the U.S. Army Corps of Engineers and the Washington Aqueduct Wholesale
Customer Board to ensure the provision
of high quality water that meets or exceeds all environmental and health
regulations.
-
To evaluate
our ability to provide full services to all current and future Arlington
customers over many years and provide capital, operational, and financial plans
to ensure the infrastructure is in place.
-
To manage
operating and capital activities in a manner that minimizes rate increases.
-
To provide high quality design and construction
management services for all utility capital projects.
-
To continue the ongoing maintenance of the County's
utility infrastructure and to ensure that high-quality products and services
are delivered to the County's residents.
-
To mitigate natural and non-natural emergency events
that impact water or sewer services.
-
To implement the 2001 update to the Water Pollution
Control Division Master Plan to address environmental issues, create a model
wastewater treatment facility, meet new legislative mandates, and be a good
neighbor.
PRINCIPAL
PROGRAMS: The principal programs
of the Utilities Fund are in the Departmental Summaries in this Section. In addition to the Departmental Programs,
the Fund has one joint, inter-departmental agency:

-
Department of Environmental Services Programs –
Utilities Services, Water Pollution Control
-
Department of Public Works Programs – Water, Sewer and
Streets, Utility Engineering
-
Debt Service and Other (shared between DES and DPW)
SIGNIFICANT
BUDGET CHANGES: The FY 2004 proposed budget for the Utilities Fund
(as a whole) is $38,690,062, a three percent increase from the FY 2003
adopted budget. This increase is
described in the Utilities Fund sections.
The total water/sewer rate is projected to increase no
more than $0.60 to a maximum of $5.30 per thousand gallons (Tgal), a 12.8
percent increase, producing additional revenue of $4.5M. The water rate will increase by $0.26/Tgal
to $2.36/Tgal. The sewer rate will
increase by $0.34/Tgal to $2.94/Tgal.
This cumulative $0.60 increase will be used to fund ongoing operations
and maintenance, to fund new and continuing debt service, and to continue to
maintain the fund balance to mitigate natural and non-natural emergency events
that impact water or sewer services.
Even with the rate increase, Arlington will continue to
have one of the lowest water/sewer rates in the region.
The
following fees and other revenue are proposed to fund operating and capital
costs for the Utilities Fund. The
capital fees are reflected in the capital portion of the budget.
-
Fund Balances
From Prior Years: Estimates of fund
balances are projected during each budget cycle. Projected surplus is carried over and budgeted to assist in
reducing the need to increase the water/sewer charge in the next fiscal year.
-
Interest
Earnings: Funds are invested until
such time as they are needed to cover expenses, with interest income accruing to
the Fund.
-
Water/Sewer
Billings: These charges generate
85-90 percent of the income for the Utilities Fund.
-
Water Service
Connection Fees: These fees are
paid by new water users for the physical connection to the water system. This fee recovers 100 percent of personnel,
materials, and rental of equipment costs.
-
Sewage Treatment
Charges: These charges are paid by
neighboring jurisdictions (Fairfax County and the Cities of Falls Church and
Alexandria), federal government facilities and authorities (such as the
Pentagon, and Ronald Reagan Washington National Airport) that use the County
sewage system but supply their own water and by facilities such as Fort Myer,
that use the County sewage and also pay a fee for use of the water system.
-
Water/Sewer
(W/S) Late Charges: These fees are
charged to residents who return their utilities payment past the 30-day payment
deadline. After 30 days, a six-percent
late charge is imposed on outstanding utility
bills.
-
New Account Fee: This fee is charged to any commercial entity
or resident requesting the set-up of a new utilities account. The cost for establishing a new account is
$25.
-
Turn-On Fee: This fee is charged to homeowners when they
request the County to turn on water connections to their home, which were previously
shut off. The charge for this service
is $25.
-
Flow Meter
Testing Fees: These fees are
assessed on individuals or entities requiring the flushing of fire hydrants for
flow testing purposes or requesting field inspections to count drainage fixture
units. These services are performed
upon request from developers and building owners.
-
Pretreatment Fee: This fee is assessed on Permitted Industrial
Users to recover all of the costs of the industrial pretreatment program, which
ensures compliance with state and federal standards.
-
Water/Sewer
Hook-up Fee: This fee, which is
charged to developers to enable them to buy into the system's limited capacity
by the amount of fixtures they add to the system, is paid into the capital
portion of the budget. It is used to
expand the capacity of the system through capital construction. Capital improvements that are not expansion
projects are generally funded either by PAYGO capital or bonds. Computer models that evaluate the fair share
of capacity costs for current development determine the fee.
-
Utility Marking
Fees: Fees paid to have utility
lines marked before construction begins.
PERFORMANCE MEASURES:
|
FY
2001
|
FY
2002
|
FY
2003
|
FY
2004
|
FY
2004
|
|
Actual
|
Actual
|
Estimate
|
Estimate
|
Target
|
|
Mission Outcome Measures
|
|
|
|
|
|
|
Water quality violations
|
0
|
0
|
0
|
0
|
0
|
|
Sanitary sewer backups
|
51
|
32
|
40
|
40
|
0
|
|
Notices of violations /WPCD
|
0
|
0
|
0
|
0
|
0
|
|
Percentage of utilities bills sent
according to schedule
|
86%
|
100%
|
100%
|
100%
|
100%
|