DEPARTMENT OF PARKS, RECREATION AND COMMUNITY RESOURCES
PARKS AND NATURAL RESOURCES DIVISION
CONSTRUCTION AND FACILITIES PROGRAM

PROGRAM MISSION: To provide a safe, vibrant and enjoyable community by promoting high quality maintenance and construction services to parks, open spaces and recreational facilities.

The Construction and Facilities Program provides for the care and non-routine, skilled trades maintenance, and repair or replacement of DPRCR facilities to ensure safety for and attractiveness to the community. Responsibilities include renovations and maintenance of aging community recreation centers, nature center buildings, comfort stations, picnic shelters, bridges, tennis and basketball courts, kiosks, running tracks, parking lots, and park and athletic field lighting systems. Departmental construction and mechanized equipment is repaired and maintained in this section. This section also provides support for special events and programs for the Cultural Affairs, Recreation, and Sports Divisions within the department, as well as the County Fair and other countywide events.

Construction and Facilities Program
FY 2002 FY 2003 FY 2004 % Change:
Actual Adopted Proposed '03 to '04
Personnel $950,504 $1,081,816 $1,062,255 -2%
Non-Personnel 1,029,374 975,677 967,392 -1%
Total Expenditures 1,979,878 2,057,493 2,029,647 -1%
Revenues - - - -
Net Tax Support $1,979,878 $2,057,493 $2,029,647 -1%
Authorized FTEs 22.0 22.0 21.0
Funded FTEs 22.0 22.0 21.0

SIGNIFICANT BUDGET HIGHLIGHTS:

ê Decrease in personnel expenditures is due to transfer of 1.0 FTE to the Conservation and Interpretation (C&I) Program. Normal step increases are included in this program.

PERFORMANCE MEASURES:

Objective: To provide safe and well-maintained facilities and equipment that provide direct services to the residents of Arlington and that support DPRCR programs.

FY 2001
Actual
FY 2002
Actual
FY 2003
Estimate
FY 2004
Estimate
FY 2004
Target
Mission Outcome Measures
Percent of building preventive maintenance performed per standard 60% 60% 55% 55% 55%
Percent of park shelter preventive maintenance performed per standard 80% 85% 85% 90% 90%
Percent of comfort station maintenance performed per standard 65% 65% 60% 60% 60%
Percent of court preventive maintenance performed per standard 75% 75% 70% 70% 70%
Percent of light pole preventive and fixture maintenance performed per standard 70% 70% 70% 70% 70%
FY 2001
Actual
FY 2002
Actual
FY 2003
Estimate
FY 2004
Estimate
FY 2004
Target
Workload Measures
Number of DPRCR bldgs./sq. ft. 27/251,816 31/295,000 31/295,000 34/296,700 34/296,700
Number of park shelters/sq. ft 42/32,000 44/33,500 44/33,500 47/34,375 47/34,375
Number comfort stations/sq. ft maintained 23/24,000 23/24,000 23/24,000 24/24,500 24/24,500
Number of running tracks/linear ft. maintained 3/4,200 3/4,200 3/4,200 3/4,200 3/4,200
Number of parking lots/sq. ft maintained 38/897,476 42/959,476 42/959,476 44/962,636 44/962,636
Number of tennis courts/sq. ft. maintained 97/554,400 99/565,600 99/565,600 99/565,600 99/565,600
Number of basketball courts/sq. ft. maintained 95/427,500 96/427,500 96/427,500 96/427,500 96/427,500
Number of field light poles/fixtures maintained 164/772 164/772 164/772 178/880 178/880
Number of court light poles/fixtures maint 328/940 328/940 328/948 359/986 359/986
Number of mechanized equipment maintained 400 400 400 420 420
  • Declining ability to meet prescribed skilled trades preventive maintenance in buildings, comfort stations, basketball and tennis courts, field and court poles, as scheduled, is due to the aging and outdated infrastructure. This increases cost and time to make repairs needed at these facilities. For example, the average building age without renovation is 40 years. The average age of an asphalt court is 32 years, far in excess of the national average life of asphalt playing surfaces of 20 years. Our wooden poles' average age is 31 years old, also beyond their life expectancy of 18 years. The national average age of an asphalt parking lot is 20 years and the average age of our parking lots is 37 years.

FUTURE BUDGET CONSIDERATIONS:

  • Costs for maintenance continue to increase on DPRCR buildings and facilities due to aging infrastructure and new facility responsibilities.
  • Costs for maintenance of ornamental fountains at Dark Star Park, Gateway Park, Crandall Mackey, and Clarendon Park. (Future pump and filter repairs).
  • When the construction is completed for Greenbrier Park, Barcroft Park and North Tract, funding will be needed to address future maintenance needs.
  • Utility cost such as gas, water, electric and phones services for new park expansions, such as Westover, Barcroft, Greenbrier, Reaves property, and Smartscape building will strain existing maintenance resources.
  • Maintenance costs associated with Small Parks Grant Program and NC Program for such amenities as new drinking fountains, park benches, and kiosks.
TOP OF PAGE