DEPARTMENT OF PUBLIC WORKS
WATER, SEWER AND STREETS DIVISION
DIVISION OPERATIONS
PROGRAM MISSION: The mission of the Streets
Program is to maintain the County's streets, sidewalks, and storm water
infrastructure.
The
General Fund program includes Street Maintenance, Storm Sewer Maintenance and
emergency responses related to opening roadways and storm drainage systems.
-
Contract Concrete Maintenance is focused in
three areas: low-density residential,
high-density residential and commercial, and maintenance before paving. The goal of the maintenance before paving
effort is to repair concrete curbs, gutters, and sidewalks prior to repaving
streets. The low-density residential
effort is intended to correct deficiencies in concrete curbs, gutters and
sidewalks in low-density residential zones on a six-year cycle. The high-density assessment program repairs
concrete curbs, gutters and sidewalks in higher density zones at the expense of
adjoining property owners. Revenues
substantially offset expenses in this effort.
-
Capital Construction is estimated to be
approximately 19 percent of the total Division's efforts, however over 50
percent of the expenditures in this program are offset by charges made to
capital projects. This enables the
Department of Public Works to have resources to perform capital construction
projects, as well as perform maintenance work for other agencies, such as
Arlington County Schools and for the Parks and Natural Resources Division where
feasible. The equipment and personnel
are then available for emergencies such as snowstorms, and other (typically)
weather-related events.
-
General Maintenance is primarily focused on
asphalt maintenance, bus shelter maintenance, graffiti removal and
miscellaneous concrete maintenance.
Asphalt maintenance ranges from pothole patching to full excavation and
replacement, depending on existing conditions.
These personnel and equipment are also used to respond to snow and other
emergencies.
-
Utility Patching is budgeted as a part of the
capital construction effort. This
program repairs asphalt and concrete after the Public Works Water and Sewer
crews make cuts in the pavement for water or sewer related repairs. All work performed in this effort is charged
to the Utilities Fund (personnel and non-personnel expenses).
-
Emergency (Snow) Response is also funded in this
program, and it relies primarily on the equipment and personnel that perform
the other tasks. Snow is estimated to
be about ten percent of the financial effort on average, but this estimate only
includes the cost of materials, overtime, and work by staff in other divisions,
or programs. The cost of the vehicles
and staff time has typically been budgeted in the other crews, such as capital
construction and maintenance.
-
Storm Sewer Maintenance was enlarged in FY 2002
to include catch basin cleaning and pipe inspection. The effort also includes repairs to damaged or failed pipes,
structures, and the cleaning of blocked lines and street lines. The storm drainage effort includes
maintenance to open channels when necessary, and removal of vegetation along
the Four Mile Run flood control project.
Positions and vehicles are now
allotted to specific efforts, but employees are assigned and scheduled to
respond to County needs. For example,
during a snowstorm, all employees
and equipment will be engaged in snow removal efforts. Following the storm, they typically have to
focus more efforts on repairing asphalt that was damaged by the winter
weather. During the summer construction
season, more efforts are focused on
capital work and work for others, and in the fall, some vehicle drivers work with the Department of Environmental
Services on leaf collection.
|
Division
Operations
|
|
FY 2002
|
FY 2003
|
FY 2004
|
% Change:
|
|
Actual
|
Adopted
|
Proposed
|
'03 to '04
|
|
Personnel
|
$2,681,961
|
$2,810,966
|
$2,886,566
|
3%
|
|
Operating
|
2,919,925
|
3,617,344
|
3,626,433
|
-
|
|
Intra-County
Charges
|
(516,989)
|
(393,803)
|
(393,803)
|
-
|
|
Total Expenditures
|
5,084,897
|
6,034,507
|
6,119,196
|
1%
|
|
|
|
|
|
|
Revenues
|
312,703
|
645,000
|
645,000
|
-
|
|
Net Tax Support
|
$4,772,194
|
$5,389,507
|
$5,474,196
|
2%
|
|
|
|
|
|
|
|
Authorized FTEs
|
64.3
|
64.3
|
65.3
|
|
|
Funded FTEs
|
64.3
|
64.3
|
65.3
|
|
SIGNIFICANT BUDGET HIGHLIGHTS:
-
Administration of the Paving Program was moved from
Engineering to the Water, Sewer and Streets Division beginning with the 2003
calendar year. This will place control
of all repair options in one unit. The additional position shown in FY 2004 was
reassigned from the Engineering Division.
-
In FY 2004, responsibility for bus shelter maintenance
will move from this Division to the Transit Unit in the Planning Division. This Division will remain the service
providers for the Transit Unit, but the Transit Unit will manage the program
and evaluate service options. The
change in management is reflected as an increase in Work for Others ($35,000),
which has the effect of reducing the personnel budget by that amount.
PERFORMANCE MEASURES:
| |
|
FY
2001
|
FY
2002
|
FY
2003
|
FY
2004
|
FY
2004
|
| |
|
Actual
|
Actual
|
Estimate
|
Estimate
|
Target
|
| |
Mission Outcome Measures
|
|
|
|
|
|
| |
Graffiti responded to in 72 hours
|
100%
|
100%
|
100%
|
100%
|
100%
|
| |
Pavement condition rating
|
71
|
71
|
71
|
70
|
70
|
| |
Concrete maintenance zones completed
|
1.5
|
1.5
|
1
|
1
|
1
|
| |
|
|
|
|
|
|
|
Workload Measures
|
|
|
|
|
|
|
|
Maintenance cost per lane mile
|
$3,727
|
$3,457
|
$3,420
|
$3,440
|
$3,440
|
|
|
Emergency operations cost per mile
|
$724
|
$267
|
$685
|
$685
|
$685
|
|
|
Catch basins cleaned
|
457
|
2,530
|
2,570
|
2,600
|
2,600
|
|
|
Storm sewer linear feet inspected
|
N/A
|
55,583
|
46,200
|
46,200
|
46,200
|
|
|
Tons
of asphalt placed in paving program
|
41,700
|
50,600
|
45,000
|
37,500
|
37,500
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
-
A reduction in tons of asphalt placed in paving program
is a result of the proposed decrease in capital funding for the Paving Program.
-
Pavement rating is determined by regular inspection and
evaluation of street conditions and calculated on a County-wide basis through
the pavement management software. A
condition rating of 70 to 75 is considered good.
|