2004 STRATEGIC INITIATIVE PROPOSAL

Overview of Strategic Initiative

Department: Public Works

Strategic Initiative: Transportation: Pedestrian, Transit, and Parking Initiatives

Nine options are presented that are intended to provide significant contributions to the implementation of the Urban Village by further improving the friendliness, attractiveness, and opportunity for mobility of residents and visitors.

  • Walk Arlington is presented to further planning efforts for pedestrian areas that look at incorporation of the Arts, malls, and places as a component of the pedestrian system as a pilot along the Rosslyn-Ballston corridor.
  • Wayfinder Program is to create a system of signage that helps make getting to destinations (including parking) easier, safer, and friendlier.
  • Pedestrian Countdown Program will install more of these special signals to further make Arlington pedestrian safe and friendly.
  • The North/South Arlington Routes replaces the Metrobus Route 22 using smaller, attractive compressed natural gas (CNG) busses along less congested routes to improve access and mobility for its neighbors.
  • Columbia Pike Shuttle will enable the reduction in the size of busses, reduce air emissions, and improve access and mobility for route neighbors.
  • ART Transit Coordinator and Operations Support is presented to provide staff needed to implement the various ART expansion routes and coordinate services with the Washington Metropolitan Area Transit Authority (WMATA) to ensure service needs are maximized by the services provided.
  • Parking Meter Rate Increase is presented to provide parking options for short-term parkers, to improve the business performance and access to local stores, and improve a user fee revenue stream for the County.
  • Parking Meter Asset Management Plan is presented to ensure reliability of the parking meter system and its benefits to citizens, businesses, and the County.
  • Arlington County Parking Coordinator to evaluate existing parking policies and procedures; service design; operations planning, implementation and coordination; as well as monitoring daily operations and resolving problems.


Performance Measures

Performance Measure FY
2001
FY
2002
FY
2003
FY
2004*
Analysis
Increased number of pedestrians using the Rosslyn-Ballston corridor N/A N/A 0 +3% Counts are taken at 10 locations and compared to baseline counts taken in FY 2003.
Reduction in pedestrian-related accidents at countdown signal locations N/A N/A 20% 10% Police accident data is evaluated and compared to prior year data.
Annual Ridership of North/South Connector N/A N/A 0 120,000 Bus route opens in December, so half year ridership lost to mid year delay. Expected ridership to be 255,000.
Annual ridership of Columbia Pike Shuttles N/A N/A 0 100,000 Bus starts in September so some riders lost to quarter delay. Ultimate ridership expected to be 140,000.
Growth in parking turnover in a 24 hour period N/A N/A 0 5% Baseline data is established prior to rate increase at representative locations and compared to data taken after the rate increase.

*Anticipated benefit with strategic option approval



Funding Information

New
FTEs
Year 1
Costs
Year 2
Costs
Walk Arlington 1.0 $ 71,000 $ 73,130
Wayfinder Program 2.0 $ 303,270 $ 160,000
Pedestrian Countdown Program $ 57,092 $ 50,000
South/North Arlington Metrobus 22 Replacement $ 23,000 $ 23,690
Columbia Pike Shuttles $ 168,038 $ 259,045
ART Transit Coordinator and Operations Support 2.0 $ 142,600 140,698
Parking Meter Rate Increase ($900,000) ($900,000)
Parking Meter Asset Management $ 45,000 $ 56,350
Arlington County Parking Coordinator 1.0 $ 90,000 $78,280
TOTAL STRATEGIC OPTION 6.0 $0 ($ 58,807)

Note: There would be no Net Tax Support, providing the Parking Meter Rate Increase is approved.