Project Name Wilson Blvd Phase III - 10th Street to N. Lincoln St.
Summary This phase of the Wilson Blvd Improvements includes the 10th and Wilson Blvd intersection to N. Lincoln Street and will tie back into the Phase I work previously completed. The project will provide wider ADA compliant sidewalks, new crosswalks, signals, new streetlights and new street trees. Street and sidewalk easements are required from 4 properties. Utility Undergrounding from Z-burger to the DVP substation is required.
Current Status Active, currently in the Design phase (3 of 5).
[01/06/2014] This project is working on 50% engineering Design. Right of way easements from some adjacent properties are required. Undergrounding of overhead utilities is also in the design phase.
[04/24/2012] This Project is at 25% engineering design.
   
Neighborhood Ballston - Virginia - Square
   
Primary Street WILSON BLVD
Secondary Street(s) 10TH ST N, N LINCOLN ST
   
Project Type Street Improvement Projects
   
Work Types Sidewalk, Curb & Gutter, Traffic Signals, Striping, Streetscape, Design Team B
   
This Project Belongs to the following Arlington County program:
 
Complete Arterial Streets
This program works on State roads and major County streets to improve safety, provide multimodal mobility and improve community livability. Funding is provided by Federal, State and County sources.
 
Program's Mission:   Enhance mobility for pedestrians and motorists in Arlington County by providing a safe, convenient, aesthetically pleasing, environmentally responsible transportation system for all users.
 
Contact Us Frequently Asked Questions Terms and Conditions Accessibility
2100 Clarendon Blvd. Arlington, VA 22201 Tel: 703-228-3000 TTY: 703-228-4611